Bridgewater Italy
BRIDGEITALY
Wednesday, April 6, 2011
Villa Erba, Como – Italy
| ORARIO |
RELATORE |
TITOLO ARTICOLO |
| 15.05 |
Prof. Piercarlo Fabbio |
Alessandria fra Mayer e Libeskind |
| 15.20 |
Ass.Arch. Angelo Formichella |
Recupero del ponte di Alessandro Manetti a Poggio a Caiano (PO) |
| 15.35 |
Ing. Gustavo Mischi |
Circonvallazione di S. Andrea nel comune di Bressanone (BZ) |
| 15.50 |
Ing. Renato Stilliti/Donato Musci |
Realizzazione sovrappasso ferroviario in Comune Civate al Piano (BG) |
| 16.05 |
Prof. Antonio Capsoni/Massimo Raccosta |
Adda river crossing along APL |
| 16.20 |
Ing. Massimo Viviani/Alberto Carlucci |
The construction of prestressed concrete bridges with optimization of falsework |
| 16.35 |
Prof. Mario De Miranda |
The Oiapoque Bridge: a new link between Europe and Brazil |
| 16.50 - 17.00 |
COFFEE BREAK |
| 17.05 |
Prof. Carmelo Gentile/Roberto Gentile |
A steel-composite shallow arch bridge with skew deck |
| 17.20 |
Prof. Luigi Fenu |
Some applications of topology optimization to bridge design |
| 17.35 |
Junqing Xue |
Parametric analysis of debonding on the circular CFST structures |
| 17.50 |
Ing. Michele Fabio Granata/Benedetta Fontana |
Architectural and structural features in the design of an integral footbridge |
| 18.05 |
Ing. Gilberto Dreas |
Elevated guideway structures in urban environment built using the precast segmental method |
| 18.20 |
Ing. Silvio Manfrinato/Maurizio Milan |
The bridge of peace from the concept to completation, a year well spent |
| coordinatori |
Proff. Siviero Enzo, Briseghella Bruno, Zordan Tobia |
Click here to view a file of the above program